We are in the process of migrating this forum. A new space will be available soon. We are sorry for the inconvenience.

Network work 30 March


oles@ovh.net
03-30-2011, 05:14 AM
finished.

oles@ovh.net
03-30-2011, 03:48 AM
http://status.ovh.ie/?do=details&id=...72179d675edabf
We will change the configuration of links between the 4 routers vss-1/2/3/4 and 2 rbx-g1/g2 routers. Instead of 2 channel ports of 2x10G each, we will go to 1 channel port of 4x10G. The goal is to reduce the number of routes on all 4 routers and better balance the links.